2006 09 Kitchen Remodel |
2006 09 01 Cabinets in Progress 2006 09 07 Demolition, Problems 2006 09 14 Vent and Posts Move I 2006 09 19 Vent and Posts Move II 2006 09 25 Cabinets in Progress 2006 10 10 Cabinets in Progress 2006 10 16 Sheetrock, Lighting 2006 10 20 Paint, Cabinet Layout 2006 10 21 Cabinet Install Day 1 2006 10 22 Cabinet Install Day 2 2006 10 23 Cabinet Install Day 3 |
|
2006 09 05 Demolition StartsWork begins today .. with demolition. Here are a couple of snaps of the emptied kitchen. It felt very odd to be in the room while empty like this. It felt as if we were moving, or something had happened. And after 7 hours of banging away we have this .. the ductwork in the corner is a surprise and will have to be dealt with, but should not be a big problem.
|
||||||